Everything was taken out of the building to allow the installation of the new poured in floor. Every table, tank, shelf, conical, kalwal tube, carboy, sieve....had to be brought up the stairs and store in a pod storage unit.
While outside, most of the wooden stuctures were painted and repaired.
News from Rick coming from Africa are good.